October 21, 2021
Contact: Douglas Cote, Plant Ops. Dir., 694-3165, dcote@mawss.com
Wastewater Overflow
1725 Dauphin Island Pkwy. (Rear on Easment)
Mobile Area Water & Sewer System (MAWSS) responded to an intermittent wastewater overflow that occurred over three days, beginning October 18 – 21, on an easement at the rear of 1725 Dauphin Island Pkwy. The overflow has stopped. Approximately 4,320 gallons of wastewater flowed into Rabby Creek due to debris and a break on a low-pressure sewer force main. MAWSS crews have repaired the force main and are taking steps to prevent future overflows at this location.
More Info
MAWSS Park Forest Plaza
4725 Moffett Road
Mobile, AL 36618